Re: Conditional Approval Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report (dated September 12, 2025)
Fields of Study & Subjects
Mine drainage and remediation techniques
Tailings Management and Properties
Groundwater flow and contamination studies
Publication details
- Journal / source
- Digital Commons - Montana Tech (Montana Tech of the University of Montana)
- Publication date
- 7 January 2026