Re: Conditional Approval Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report (dated September 12, 2025)

Read full text
Authors: Emma Rott
Cited by: 0

Fields of Study & Subjects

Mine drainage and remediation techniques Tailings Management and Properties Groundwater flow and contamination studies

Publication details

Journal / source
Digital Commons - Montana Tech (Montana Tech of the University of Montana)
Publication date
7 January 2026