Graph-Enhanced Deep Reinforcement Learning for Multi-Objective Unrelated Parallel Machine Scheduling

Read full text
Authors: Bülent Soykan, Sean C. Mondesire, Ghaith Rabadi, Grace M. Bochenek
Cited by: 0

Abstract

The Unrelated Parallel Machine Scheduling Problem (UPMSP) with release dates, setups, and eligibility constraints presents a significant multi-objective challenge. Traditional methods struggle to balance minimizing Total Weighted Tardiness (TWT) and Total Setup Time (TST). This paper proposes a Deep Reinforcement Learning framework using Proximal Policy Optimization (PPO) and a Graph Neural Network (GNN). The GNN effectively represents the complex state of jobs, machines, and setups, allowing the PPO agent to learn a direct scheduling policy. Guided by a multi-objective reward function, the agent simultaneously minimizes TWT and TST. Experimental results on benchmark instances demonstrate that our PPO-GNN agent significantly outperforms a standard dispatching rule and a metaheuristic, achieving a superior trade-off between both objectives. This provides a robust and scalable solution for complex manufacturing scheduling.

Fields of Study & Subjects

Scheduling and Optimization Algorithms Advanced Manufacturing and Logistics Optimization Healthcare Operations and Scheduling Optimization

Publication details

Journal / source
arXiv (Cornell University)
Publication date
8 February 2026
Language
EN
Document type
Preprint