Design standards : Employer's requirements supporting documents : Soft landings guide : Shared resources

Read full text Summarise with VIRAT
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Introduction 2 DfE Soft Landings process 2.1 Roles and responsibilities 2.2 Supporting processes 2.2.1 Information management 2.2.2 Lessons learned 2.2.3 Close monitoring to ensure build quality, compliance and optimisation 2.3 Soft Landings across work stages RIBA Stage 0: Strategic Definition (Pre-Feasibility) RIBA Stages 1-2: Preparation and Briefing to Concept Design (Feasibility/Procurement) RIBA Stage 3: Spatial Coordination (Planning) RIBA Stage 4: Technical Design (Contractor's Proposals) RIBA Stage 5: Manufacturing and Construction (Pre-Handover) RIBA Stage 6: Handover (including 12-month Rectification Period and Post Completion Activities) 2.4 Useful reference information SummaryThis document is the Soft Landings Guide to be used as part of the DfE Soft Landings process for all DfE delivered schemes using the DfE Construction Framework 2025 (CF25) 1 .The Soft Landings Guide outlines DfE's process pursuant to Government Soft Landings (GSL) to ensure easy transition across the briefing, design, construction and occupation stages of a Scheme with the overriding aim of realising optimal operational performance. Review dateThis document shall normally be reviewed at 12-month intervals however, DfE reserve the right to update it at any time. Who this publication is for?This resource is for:• local authorities (for community, voluntary-controlled schools, foundation schools and maintained nursery schools) • academy trusts (for academies and free schools) • governing bodies (for voluntary-aided schools) • school/college leaders, staff and governing bodies in; further education colleges and designated institutions, sixth form colleges, maintained schools, academies and free schools, pupil referral units, City Technology Colleges, non-maintained special schools and maintained nursery schools • technical professionals involved in the design, construction and maintenance of school and college premises.Academy trusts with a religious character and the responsible bodies for voluntary-aided and voluntary controlled schools should engage with the land/site trustees for their land and buildings and the relevant religious body, most often their Diocese.

Fields of Study & Subjects

Construction Project Management and Performance Sustainable Building Design and Assessment BIM and Construction Integration

Publication details

Journal / source
Digital Education Resource Archive (University College London)
Publication date
1 January 2026
Language
EN