DT Trigger Primitives BX mis-ID studies for the Phase 2 upgrade

Read full text Summarise with VIRAT
Authors: CMS Collaboration
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

With the so called Phase 2 upgrade, which the CMS Drift Tubes (DT) will undergo during the LHC Long Shut Down 3, the DT time resolution at the local trigger level will greatly improve. Therefore the Bunch Crossing identification capability associated to Trigger Primitive generation is also expected to improve. The method developed to quantify the BX mis-identification probability (BX mis-ID) in Run 3 was applied to simulated Phase 2 data and the results confirmed this expectation: with less than 2\% BX mis-Id at chamber level, the DT alone could be able to keep pre-firing of Barrel Muon Track Finder below 0.5\%.

Fields of Study & Subjects

Particle Detector Development and Performance Particle physics theoretical and experimental studies Particle accelerators and beam dynamics

Publication details

Journal / source
CERN Document Server (European Organization for Nuclear Research)
Publication date
25 March 2026
Language
EN