Работа эстакад высокоскоростных железнодорожных магистралей на продольные сейсмические воздействия

Read full text Summarise with VIRAT
Authors: Шульгин Алексей Александрович, Смирнов Владимир Николаевич
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Objective: to account for the behavior of continuous welded rail (CWR) on high-speed railway viaducts under seismic actions along the track axis. Methods: development of a calculation methodology that includes a behavior analysis of the “bridge — CWR” system for span-type viaducts with continuous welded rails under longitudinal seismic actions. Results: calculation procedures for viaducts with continuous welded rails under longitudinal seismic forces. Practical significance: provision of a framework for the design and analysis of viaducts with continuous welded rails under longitudinal seismic actions.

Fields of Study & Subjects

Railway Engineering and Dynamics Seismic Performance and Analysis Structural Engineering and Materials Analysis

Publication details

Journal / source
Известия Петербургского университета путей сообщения
Volume
23
Issue
1
Publication date
1 January 2026
Language
RU